What technique can be employed to reduce lost load by preventing slipping?

Prepare for the Tennessee Residential Contractor Test. Study with flashcards and multiple choice questions; each question comes with hints and explanations to bolster your learning. Get exam-ready now!

Slot dozing is a technique used in excavation and grading to minimize the loss of load that can occur during the process. This method involves creating slots or grooves in the surface as the dozer moves forward. By using this technique, the dozer can maintain better control over the material being moved, thereby reducing the risk of slipping or spilling the load.

The key to slot dozing is that it helps to contain the material more effectively within the confines of the slots, allowing for a more efficient transfer of earth or other materials without substantial loss. This approach is particularly useful in situations where precision and minimal disruption of the surrounding area are essential, leading to better performance and productivity on the worksite.

In contrast, other dozing methods, such as bucket dozing, reverse dozing, or precision dozing, involve different techniques and may not specifically target the challenge of preventing slipping in the same manner as slot dozing. Each of these methods has its own applications, but for the specific concern of reducing lost load due to slipping, slot dozing stands out as the most effective approach.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy