What causes excessive bleeding in concrete?

Too much water

Too much air

Excessive bleeding in concrete primarily occurs due to the presence of too much water in the mix. When concrete is mixed with an excessive amount of water, the water-to-cement ratio is increased beyond the ideal levels. As the concrete begins to set, the excess water rises to the surface, creating a phenomenon known as bleeding. This causes a layer of water to appear on top of the concrete, which can lead to various issues, such as a weakened surface, reduced durability, and poor bond strength with subsequent layers or finishes.

While air, temperature, and humidity can indeed affect the properties and setting behavior of concrete, they do not directly cause excessive bleeding in the same way that an over-watered mix does. High air content can actually improve concrete's workability, too low temperatures can slow the setting process, and high humidity can influence curing but are not the primary factors leading to the excessive bleeding that stems from an imbalanced water ratio.

Too low temperature

Too high humidity

Want more questions?

All options are one-time payments.

$29.99

6 month DELUXE pass (most popular)

Full access FOR 6 MONTHS! & the ultimate digital PDF study guide (BONUS)

  • Ad-free experience
  • View your previous attempt history
  • Mobile app access
  • In-depth explanations
  • 6 months of full access
  • Ultimate digital PDF study guide included
  • Priority support
$14.99 $19.99

Ultimate digital PDF study guide

For those that prefer a more traditional form of learning

  • Available for instant download
  • Available offline
  • Hundreds of practice multiple choice questions
  • Comprehensive content
  • Detailed explanations
Image Description
Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy